If the DNO (definition available) or Gas Transporter has finished the infrastructure — or you already have a live MPAN (definition available)/MPRN (definition available) that needs swapping or upgrading — this is the short path. Many jobs completed within 10 working days.
From signed supply contract to meter installed and energised. Most jobs completed within 10 working days.
In the majority of cases the cost of the meter installation is covered by the energy supplier or built directly into your supply contract — meaning nothing for you to pay out of pocket on the install itself.
Five steps from signed quote to live meter. Most customers only have to act on steps 1, 2 and 4 — we do the rest in the background.
We collect your MPAN (definition available)/MPRN (definition available) (or DNO (definition available)/GT (definition available) completion paperwork), check the metering profile and confirm load and capacity.
We tender across our 30+ supplier panel — matrix or bespoke pricing — and get the supply contract signed and accepted.
We arrange to register the supply and appoint the Meter Operator and Data Collector.
The MOP (definition available) contacts you to book a slot. We check the site is ready and the meter position is safe and accessible.
Meter installed, supply on, billing data flowing. Your account manager handles any post-install snags.
Three minutes to start a quote. We'll come back with a meter date.
Start my meter quote